You don't have javascript enabled. Good luck with that.
Pencarian
Underpass Senen Extention Diuji Coba Mulai November 2020
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Senen Underpass Extension will Be Tested in November 2020

Progress of extension construction on Senen Underpass now has reached 87 percent. It is faster than the predetermined target plan.

We are optimistic that the construction can finish in December

Jakarta Bina Marga Agency Head, Hari Nugroho conveyed, construction progress reached 87 percent, while the initial plan was 86 percent. It means there was positive deviation about one percent.

Central Jakarta Bina Marga Focuses on Anticipating Inundation on the Roads

This construction is focusing on finishing road work under the tunnel and installing ACP wall as facing wall thus the tunnel walls look beautiful.

After seeing the progress, he was optimistic that Senen Underpass Extension could be tested by the end of November 2020.

"We are optimistic that the construction can finish in December and be inaugurated in the end of December. At the end of November, we will test it for open traffic while fixing what we miss. In mid December, it will be ready for public use," he mentioned.

Moreover, his side is also restoring sidewalk and arranging drainage channels both above underpass and under the tunnel.

Also, other works that are on process such as underpass pump to remove rain water from tunnel, mechanical electrical work, and artistic lighting work both in tunnels, pedestrian bridges (JPO)s, and Transjakarta bus shelters.

"We still have to finish construction on JPOs which equipped with elevator at Pasar Senen JPO and JPO in front of Atrium, and repairing damaged roads due to project work using hot mix layer," he explained.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye797 personBudhi Firmansyah Surapati
  2. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye793 personTiyo Surya Sakti
  3. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye781 personTP Moan Simanjuntak
  4. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye482 personFolmer
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye378 personBudhi Firmansyah Surapati